Total value of work done to date (A) |
|
Deduct value of work shown on previous bill |
|
Net value of since previous bill (F) Figure ( F) in words |
|
Part II Account of secured advances allowed on the security of materials to site
Quantity out standing from previous bill |
Deduct quantity utilized in work measured since previous bill |
Quantity out standing including quantity to site since previous bill |
Full rate as assessed by the Divisional Officer |
DESCRIPTION OF MATERIALS |
UNIT |
Reduced rate at which advance is made |
Up to date amount of advance |
Reference to divisional officer's written orders authorizing the advance |
Reason for non clearance of advance when outstanding for more than three months |
No. |
Date |
|
|
|
|
Total amount outstanding as per this bill |
|
|
Figure (E) in words |
|
|
|
|
|
Deduct-amount outstanding as per entry © of |
|
|
|
|
|
|
|
previous bill |
|
|
|
|
|
|
|
Net amount since previous bill |
|
|
|
Part II Account of secured advances allowed on the security of materials to site
1) Entries in column 4 to 9 of part I are based on measurements recorded by (name & designation) Mr.Mahesh S. Bhoye, Sectional Engineer on in M. book No. 30 Pages 86 L to 93L checked 100 % by the Deputy Engineer on |
{2} Certificate (i) that in addition to and quite apart from the quantities or work actually executed as shown in column 4 of part I, some some work has been actually done in connection with several item and the value of such work {after deducting the proportion tionate amount of secured advance, if any ultimately recoverable on account of the quantities of materials used the therein } is in no case less than the advance payment as per column 3 of part I, made or proposed to be made for the convenience of the contractor, in anticipation of and result of detailed measurements, wich will be made as soon as possible. |
{3} Certified (I) that plus quantities of material shown in column 8 of part II above have been actually have brought by the contractor to the site work and the contractor has not previously received any advance on their security (ii) that this materials of an imperishable nature and required by the contractor for use in the work in connection with the item for wich the rate for finished work have been agreed upon and (iii) that a formal agreement in form 50 designed and executed by the contractor, in accordance with paragraph 10, 2, 19, of the M.P.W.A. Code is recorded in the divisional office. |
Dated signature of the contractor |
*Dated signature of officer presenting the bill |
|
Dated payment of office authorizing payment |
*This signature is necessary only when the officer preparing the bill not officer authorizing the payment |
@if (!empty($signature))
@foreach ($signature as $val)
{{-- ![]()