STEM WATER DIST. & INFRA. CO. PVT. LTD., THANETENDER NOTICE NO. ______ 2022-2023FORManaging Director STEM Water Distribution and Infrastructure Co. Pvt. Ltd. Vardan Commercial Complex, 9th Floor, MIDC, Road No.16, Wagale Estate, Thane (w) - 400 604. |
STEM WATER DIST. & INFRA.CO.PVT. LTD., THANE
Name of Work:-
TENDER NOTICE NO. FOR 2022 - 2023
Sr. No. |
Description |
Page No. |
1 |
Detailed Tender Notice |
|
2 |
Form B-1 |
|
3 |
Condition of Contract |
|
4 |
General Condition of Contract |
|
5 |
Material Schedule – A |
|
6 |
Detailed Item-wise Specification |
|
7 |
Schedule – B |
|
8 |
Letter of Application |
|
9 |
Affidavit |
|
10 |
Undertaking |
|
11 |
Affidavit (on Rs.100/- Stamp Paper) |
|
12 |
Form Of Bid |
|
13 |
Performance of Bank Guarantee |
|
14 |
Letter of Acceptance |
|
15 |
Agreement Form |
|
16 |
Notice to Proceed Work |
|
17 |
Annexure (If Any) |
|
18 |
Layout / General Arrangement Drawings |
STEM WATER DIST. & INFRA.CO.PVT. LTD., THANE
Managing Director on behalf of the STEM Water Distribution & Infrastructure Co. Pvt. Ltd., Thane invites tenders through E-Tendering Two envelop System for the following work on percentage rate B-1 tender basis from experienced contractors having valid registration of a. The firm must have valid registration of Class ‘A’ and above in appropriate equivalent class in (Elect./Mech.) with MJP /PWD or any other Government Organization.
Sr. No. |
Name of Work |
Estimated cost (In Rs.) |
Earnest Money Deposit (In Rs.) |
Cost of Tender (In Rs.) |
Period of Completion |
1 |
|
/- |
/- |
/- |
Months |
(Excluding GST) |
(From Bidders own Bank Account) |
(Including 18% GST) |
Calendar months including monsoon |
Total 4% (Four) security deposit will be recovered.
(a) |
Where the amount or value set forth in such contract does not exceed rupees ten lakh. |
Five Hundred rupees stamp duty |
(b) |
Where it exceeds rupees ten lakhs |
Five hundred rupees plus one hundred rupees for every Rs.1,00,000/- or part thereof, above rupees ten lakh subject to the maximum of rupees twenty- five lakh stamp duty |
The contractor whose offer is accepted will be called for execution of the agreement and shall only be liable to pay the stamp duty applicable there on.
No. Stage |
Stage Dates |
Date of Time Period |
1 |
Publishing Date |
Date: On / /01-01-1970 |
2 |
Document sale start |
Date: On / 01-01-1970 |
3 |
Document sale end |
Date: On / 01-01-1970 |
4 |
Bid Submission start |
Date: On / 01-01-1970 |
5 |
Bid Submission end |
Date: On / 01-01-1970 |
6 |
Technical Bid Opening |
Date: On / 01-01-1970 |
7 |
Pre Bid |
Date: On / 01-01-1970 |
Sr. No |
Components in project
|
Experience required
|
1 |
Protective Polyurethane (PU) Coating on MS Pipeline |
The firm must have experience of Protective coating/painting on MS structure/Pipeline at least minimum 21000 Sqm and above in any Govt./Semi Govt. Organization/ Government local body.
|
Financial Year
|
Multiplying Factor
|
For Year 2022-2023
|
1.10
|
For Year 2021-2022
|
1.21
|
For Year 2020-2021
|
1.331
|
For Year 2019-2020
|
1.464
|
For Year 2018-2017
|
1.610
|
For Year 2017-2018
|
1.771
|
For Year 2016-2017
|
1.948
|
iii)Before applying the chemical product, approval of the prepared surface must be obtained from the manufacturer, then the coating work should be started.
iv)This construction chemical company products should be in the approved list of PWD or MCGM or CIDCO or MORTH or IRC or any Govt./Semi Govt. Organization/ Government local body.
The contractor shall use the materials of the same company for which the authorization letter has been submitted while submitting the tender.
The contractor should have submitted undertaking that, 6 years Bank guaranty will be given for free maintenance of woks after Defect Liability Period (Undertaking-II attached)
USE OF SPECILISED MACHINERY:
For carrying out structural and RCC work strengthening, replacement & anti corrosive coating work, use of specialized machinery for carrying out work shall be as mentioned below.
List of machinery : -
The details of machinery as above, supplied in Envelope No.1 shall be verified by the Department, if required, by physical verification of machinery owned/ hired by the contractor, by visiting sites. Contractor should produce sufficient documentary evidence regarding ownership machinery in support of having owned/ hired the obligatory machinery. The details of the specialised machinery required to be owned/ hired and as M.O.R.T. &H direction used on the work are given (Statement 2A ) of N.I.T. In case, during physical verification of the details supplied by the bidder if it is found that the machinery is not meeting with the requirements of the Department, his tender in Envelope No.2 will not be considered for opening.
For this purpose, contractor shall give information in proforma of statement No.2A enclosed. The proforma of statement shall not be altered by contractor in any manner/case.
The contractor shall submit scanned copy of an affidavit (as per proforma given through online regarding availability of owned/ hired machinery in Technical Bid. Affidavit not confirming to the contents in prescribed format will not be accepted and EnvelopeNo.2 will not be opened.
Name of
Other party (s)
|
Cause of dispute
|
Litigation where (Court / arbitration)
|
Amount involved
|
Conditional Tender will be rejected. Right to reject any or all tenders without assigning any reason thereof is reserved by the Competent Authority of STEM whose decision will be final and binding on tenderers.
Managing Director |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
STEM WATER DISTRIBUTION & INFRASTRUCTURE CO. PVT. LTD., THANE
|
||||||
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
|
||||||
|
DEPARTMENT :
STEM Water Distribution & Infrastructure Co. Pvt. Ltd.
|
|||||
DIVISION:
Operation/ Project/ FDC
|
|
|
|
|
||
GENERAL RULES & DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS
|
||||||
1
|
All works, proposed to be executed by Contract, shall be notified in a Form of invitation to tender, pasted on a Notice Board hung up in the office of the Managing Director/ Published in News Paper's. This form will state the works to be carried out as well as the date of submitting and opening tenders, and the time allowed for carrying out the work, also the amount of earnest money to be deposited with the tender, and the amount of the security deposit to be deposited by the successful Tenderer and the percentage, if any, to be deducted from bills. Copies of any other documents required in connection with the work shall be signed by the Managing Director for the purpose of identification and shall also be open for Inspection by Contractors at the office of the Managing Director during office hours/ Available On-line. Where the works are proposed to be executed according to the specifications recommended to a Contractor and approved by a competent authority on behalf of the STEM Water Distribution & Infrastructure Co. Pvt. Ltd., Thane, such specifications, with designs and drawings shall form a part of the accepted tender.
|
|||||
2
|
In the event of the tender, being submitted by a firm, it must be signed by Partner thereof, and in the event of the absence of any Partner, it shall be signed on his behalf by a person holding a power of attorney authorizing him to do so.
|
|||||
2. A (i)
|
The Contractor shall pay along with the tender the sum of
Rs.3,35,000
/-
(Rupees Three lakh Thirty-Five thousand only)
as and by way of Earnest Money. The said amount of earnest money shall not carry any interest whatsoever. The contractors should have to submit EMD as per E- Tendering procedure.
|
|||||
(ii)
|
In the event of his tender being accepted to the provisions of Sub-Clause (iii) below, the said amount of Earnest Money Deposit shall be appropriated towards the amount of security deposit payable by him under conditions of General Conditions of Contract if the contractor request so in writing.
|
|||||
(iii)
|
If after submitting the tender, the Contractor withdraws his offer or modifies the same, or if after the acceptance of his tender, the Contractor neglects to furnish the balance amount of Security Deposit without prejudice to any other rights and powers of the STEM, Contractor shall be entitled to forfeit the full amount to the Earnest Money deposited by him.
|
|||||
(iv)
|
In the event of his tender not being accepted, the amount of Earnest Money deposited by the Contractor shall unless it is prior thereto forfeited under the provisions of Sub-Clause (iii) above, be refunded to him on his passing receipt therefore.
|
|||||
3
|
Receipts for payments made on account of any work, when executed by a firm should also be signed by all the partners except where the contractors are
described in their tender as firm, in which case the receipt shall be signed in the name of the firm by one of the partners, or by some other person having authority to give effectual receipts of the firm.
|
|||||
4
|
Any person who submits a tender shall fill up usual printed form stating to what percentage above or below the rates specified in Schedule-B (Memorandum showing Item of work to be carried out) he is willing to undertake the work. Only one rate or such percentage on all estimated rates/scheduled rates shall be named, tenders which propose any alterations in the works specified in the said form of invitation to tender or in the time allowed for carrying out the work or which contain separate percentage over estimated rates / schedule rates for different sub-work or item, or which contain any other conditions, of any sort which are not filled with the percentage as the space provided for the purpose and not signed at proper place in the printed B-1 Tender Form will be liable for rejection. No printed form of tender, shall include a tender for more than one work. But, if the contractors who wish to tender two or more works, they shall submit a tender for each work separately. Tenders shall have the name and number of the work to which they refer, written outside the Envelopes/ As per e- tender procedure.showing Item of work to be carried out) he is willing to undertake the work. Only one rate or such percentage on all estimated rates/scheduled rates shall be named, tenders which propose any alterations in the works specified in the said form of invitation to tender or in the time allowed for carrying out the work or which contain separate percentage over estimated rates / schedule rates for different sub-work or item, or which contain any other conditions, of any sort which are not filled with the percentage as the space provided for the purpose and not signed at proper place in the printed B-1 Tender Form will be liable for rejection. No printed form of tender, shall include a tender for more than one work. But, if the contractors who wish to tender two or more works, they shall submit a tender for each work separately. Tenders shall have the name and number of the work to which they refer, written outside the Envelopes/ As per e- tender procedure.
|
STEM WATER DISTRIBUTION & INFRASTRUCTURE CO. PVT. LTD., THANE
|
||||||
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
|
||||||
|
DEPARTMENT :
STEM Water Distribution & Infrastructure Co. Pvt. Ltd.
|
|||||
DIVISION:
Operation/ Project/ FDC
|
|
|
|
|
||
GENERAL RULES & DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS
|
||||||
1
|
All works, proposed to be executed by Contract, shall be notified in a Form of invitation to tender, pasted on a Notice Board hung up in the office of the Managing Director/ Published in News Paper's. This form will state the works to be carried out as well as the date of submitting and opening tenders, and the time allowed for carrying out the work, also the amount of earnest money to be deposited with the tender, and the amount of the security deposit to be deposited by the successful Tenderer and the percentage, if any, to be deducted from bills. Copies of any other documents required in connection with the work shall be signed by the Managing Director for the purpose of identification and shall also be open for Inspection by Contractors at the office of the Managing Director during office hours/ Available On-line. Where the works are proposed to be executed according to the specifications recommended to a Contractor and approved by a competent authority on behalf of the STEM Water Distribution & Infrastructure Co. Pvt. Ltd., Thane, such specifications, with designs and drawings shall form a part of the accepted tender.
|
|||||
2
|
In the event of the tender, being submitted by a firm, it must be signed by Partner thereof, and in the event of the absence of any Partner, it shall be signed on his behalf by a person holding a power of attorney authorizing him to do so.
|
|||||
2. A (i)
|
The Contractor shall pay along with the tender the sum of
Rs.3,35,000
/-
(Rupees Three lakh Thirty-Five thousand only)
as and by way of Earnest Money. The said amount of earnest money shall not carry any interest whatsoever. The contractors should have to submit EMD as per E- Tendering procedure.
|
|||||
(ii)
|
In the event of his tender being accepted to the provisions of Sub-Clause (iii) below, the said amount of Earnest Money Deposit shall be appropriated towards the amount of security deposit payable by him under conditions of General Conditions of Contract if the contractor request so in writing.
|
|||||
(iii)
|
If after submitting the tender, the Contractor withdraws his offer or modifies the same, or if after the acceptance of his tender, the Contractor neglects to furnish the balance amount of Security Deposit without prejudice to any other rights and powers of the STEM, Contractor shall be entitled to forfeit the full amount to the Earnest Money deposited by him.
|
|||||
(iv)
|
In the event of his tender not being accepted, the amount of Earnest Money deposited by the Contractor shall unless it is prior thereto forfeited under the provisions of Sub-Clause (iii) above, be refunded to him on his passing receipt therefore.
|
|||||
3
|
Receipts for payments made on account of any work, when executed by a firm should also be signed by all the partners except where the contractors are
described in their tender as firm, in which case the receipt shall be signed in the name of the firm by one of the partners, or by some other person having authority to give effectual receipts of the firm.
|
|||||
4
|
Any person who submits a tender shall fill up usual printed form stating to what percentage above or below the rates specified in Schedule-B (Memorandum showing Item of work to be carried out) he is willing to undertake the work. Only one rate or such percentage on all estimated rates/scheduled rates shall be named, tenders which propose any alterations in the works specified in the said form of invitation to tender or in the time allowed for carrying out the work or which contain separate percentage over estimated rates / schedule rates for different sub-work or item, or which contain any other conditions, of any sort which are not filled with the percentage as the space provided for the purpose and not signed at proper place in the printed B-1 Tender Form will be liable for rejection. No printed form of tender, shall include a tender for more than one work. But, if the contractors who wish to tender two or more works, they shall submit a tender for each work separately. Tenders shall have the name and number of the work to which they refer, written outside the Envelopes/ As per e- tender procedure.showing Item of work to be carried out) he is willing to undertake the work. Only one rate or such percentage on all estimated rates/scheduled rates shall be named, tenders which propose any alterations in the works specified in the said form of invitation to tender or in the time allowed for carrying out the work or which contain separate percentage over estimated rates / schedule rates for different sub-work or item, or which contain any other conditions, of any sort which are not filled with the percentage as the space provided for the purpose and not signed at proper place in the printed B-1 Tender Form will be liable for rejection. No printed form of tender, shall include a tender for more than one work. But, if the contractors who wish to tender two or more works, they shall submit a tender for each work separately. Tenders shall have the name and number of the work to which they refer, written outside the Envelopes/ As per e- tender procedure.
|
|||||
5
|
The Managing Director or the competent authority or General Manager or his duly authorized Assistant shall open tenders in the presence of contractors who have submitted tenders or their representatives who may be present at the time, and he will enter the amounts of the several tenders in a comparative statement in a suitable, form. In the event of a tender being accepted, the contractor shall for the purpose of identification, sign copies of the specification and other documents mentioned in Rule-1. In the event of tender being rejected, the Managing Director shall arrange to refund the amount of the earnest money deposited to the tenderer, on his giving a receipt for the return of the money.
|
|||||
6
|
The officer competent to dispose of the tenders shall have the rights of rejecting all or any of the tenders. (MD- STEM/ BoD- STEM).
|
|||||
7
|
No receipt for any payment alleged to have been made by a contractor in regard to any matter relating to this tender or the contract shall be valid and binding on STEM Water Distribution & Infrastructure Co. Pvt. Ltd., Thane unless it is signed by the Managing Director.
|
|||||
8
|
The memorandum of work to be tendered for the schedule of materials to be supplied by the STEM Water Distribution & Infrastructure Co. Pvt. Ltd., Thane (hereinbefore and after called as "STEM" for brevity) and their rates shall be filled in and completed by the office of the Managing Director before the tender form is issued. If a form issued to an intending Tenderer has not been so filled in and completed, he shall request the said office to have this done before he completes and delivers his tender.
|
|||||
9
|
All work shall be measured net by standard measure and according to the rules and customs of the Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane without reference to any local custom.
|
|||||
10
|
Under no circumstances shall any contractor be entitled to claim enhanced rates for items in this contract.
|
|||||
11
|
Every registered contractor should produce along with his tender certificate of registration as approved contractor in the appropriate class and renewal of such registration with date of expiry. (Now as per Detail Tender Notice and as per PWD G. M GR’s Circulars in force.)
|
|||||
12
|
The measurements of work shall be taken according to the usual methods in use in the Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane and no proposals to adopt alternative methods will be accepted. The Managing Director’s decision as to what is the usual method in use in the Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane will be final.
|
|||||
13 |
The tendering Contractor shall furnish a declaration along with the tender showing all works for which he has already entered into contract, and the value of the work that remains to be executed in each case on the date of submitting the tender such certificate shall be in the proforma attached in the tender document. |
|||||
14 |
Every Tenderer shall furnish along with the tender information regarding the Income-tax Circle or Ward of the district in which he is assessed to Income-tax, the reference to the number of the assessment and the assessment year and a valid Income-tax clearance certificate. |
|||||
15 |
In view of the difficult position regarding the availability of foreign exchange, no foreign exchange would be released by the Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane for the purchase of plant and machinery or any other purpose for the execution of the work contracted for. |
|||||
16 |
Every contractor / bidder should furnish along with tender a statement showing previous experience and technical staff employed by him. |
|||||
17 |
Successful Tenderer will have to produce to the satisfaction of the accepting authority a valid and current license issued in his favour under the provision of Contract Labour (Regulation and Abolition Act, 1973) before starting work failing which acceptance of the tender will be liable for withdrawal and Earnest Money / Security Deposit will be forfeited to Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane. |
|||||
18 |
The contractor shall comply with the provisions of the Apprentices Act 1961 and the rules and orders issued there under from time to time. If he fails to do so, his failure will be a breach of the contract and the Managing Director, STEM Water Dist. & Infra. Co. Pvt. Ltd., Thane may, in his discretion cancel the contract. The Contractor shall also be liable, for any pecuniary liability arising on account of any violation by him of the provisions of the Act. |
|||||
in figure as well as in words. |
I/We hereby tender for the execution for the Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane (hereinbefore and hereinafter referred to as "STEM" of the work specified in the underwritten memorandum within the time specified in such memorandum at__________________________________________________________________________________________________________________________________________percent below/above ( in figure and word) to the estimated rates entered in Schedule B (memorandum showing items of work to be carried out) and in accordance in all respects with the specifications, designs, drawings and instructions in writing referred to in Rule 1 hereof and in clause 12 and the annexed conditions of contract and agree that what materials for the work are provided by the Stem Water Distribution & Infrastructure Co. Pvt. Ltd., Thane such materials and the rates to be paid for them shall be as provided in Schedule ‘A’ here. As per E-Tender Procedure) |
MEMORANDUM |
||||||||||||||
1.(A) |
Name of Work:
|
a) If several sub works are included, same should be detailed in a separate list.
|
||||||||||||
B) |
Estimated cost ( Including GST ): Rs./- |
|||||||||||||
C) |
Earnest money : Rs. /- |
c) The amount of earnest money to be deposited shall be in accordance with the provision of paras 206 and 207 of the MPW Manual/ As per PWD, GR dtd. 27/09/2018. |
||||||||||||
D) |
Security deposit: Total 4% of estimated cost |
d) This deposit shall be in accordance with the paras 213 and 214 of the MPW Manual/ As per PWD, GR Dtd. 27/09/2019. C/R.CAT/2017/PK-08/E2. |
||||||||||||
|
% Initial Security Deposit shall be in form of FDR / DD from any Nationalized / Scheduled Bank- Balance % Deductions through R.A. Bills. |
|
||||||||||||
E) |
- |
e) - |
||||||||||||
F) |
Additional Performance Security Deposit/ D.D./ FDR/ B.G. of any Nationalised/ As per PWD GR dtd. 29.09. 2018.Circular Dt.26.11.2018 (At/2017/DK-8/EM-2) |
f) If additional security deposit |
||||||||||||
|
||||||||||||||
|
i) If offer upto 10% below |
1% of estimated cost put to tender. |
||||||||||||
|
ii) If offer more than 10% |
1% plus ____% below more than 10% (e.g. If offer is below 14% : 1% + (14% -10%) = 5%) |
||||||||||||
|
iii) If offer more than 15% below |
6% Plus Double of the % more than 15% below (e.g. If offer is below 19% then (19% - 15%) x 2= 8% + 6%= 14%) |
||||||||||||
G) |
Time allowed for the work from date of written order to completion |